Multiple Water Shut Offs

Posted By on September 2, 2021

Dear Aria Residents,

During last week’s water shut off, we were able to replace the circuit setters for the top zone of the building (floors 17-24). The vendor will still need to make adjustments to the new circuit setters, but it won’t require another water shut off. Below is the schedule for the remaining floors that will require a water shut off to complete the circuit setter project:

Floors 8-16

The next water shut off will be on September 8th from 9:00am to 3:00pm, which is also the water shut off for residents to complete any plumbing repairs within their unit.

Floors 1-7

The bottom stack will have the most water shut offs due to the number of units on each floor. There will be a water shut off to complete the circuit setters project on September 22nd, October 13th, and October 27th. All three water shut offs will start at 9:00am and end at 3:00pm.

Location

1441 9th Avenue
San Diego, CA 92101
phone | (619) 231-4235

Management Team

General Manager
Morgan Cooper | mcooper@actionlife.com
Monday – Friday, 9AM – 5:00PM

Manager Assistant
Kate Severo | ksevero@actionlife.com

On-Site Engineer
Pat McMorrow | pmcmorrow@actionlife.com
Monday – Friday, 6AM – 2:30PM

Move In/Out Scheduling
mcooper@actionlife.com

Management Company

Action Property Management
Regional Office
750 B Street, Suite 2860
San Diego, CA 92101
phone | 949-450-0202

Corporate Office
2603 Main Street, Suite 500
Irvine, CA 92614
phone | 949-450-0202
fax | 949-450-0303